Key Insights
The Latin America data center construction market is experiencing robust growth, projected to reach \$5.14 billion in 2025 and maintain a Compound Annual Growth Rate (CAGR) exceeding 8.71% from 2025 to 2033. This expansion is fueled by several key factors. Firstly, the burgeoning digital economy across Brazil, Mexico, Argentina, and other Latin American nations is driving increased demand for cloud services and digital infrastructure. Secondly, growing investments from both domestic and international companies in data center facilities are bolstering market growth. The rise of e-commerce, streaming services, and the increasing adoption of big data analytics are significant contributors. Furthermore, government initiatives promoting digital transformation and technological advancements are creating a favorable environment for data center development. The market segmentation reveals significant opportunities across infrastructure types (electrical and mechanical), enterprise sizes (small & medium, large), and end-users (banking, IT, government, healthcare). Brazil, Mexico, and Argentina represent the largest markets within the region, benefiting from a combination of robust economies and increasing digital penetration.
However, challenges exist. While the market demonstrates significant potential, certain restraints may hinder its growth. These include high initial investment costs associated with data center construction, potential regulatory hurdles, and the need for skilled labor. Furthermore, energy costs and infrastructure limitations in some regions could present obstacles. Despite these challenges, the long-term outlook remains positive, driven by the region's increasing digitalization and the sustained investments in advanced technologies. The competitive landscape is characterized by a mix of international and local players, reflecting the diverse opportunities and challenges within the market. Strategic partnerships and technological innovations will play a crucial role in shaping the future of the Latin American data center construction market.

Latin America Data Center Construction Market: A Comprehensive Report (2019-2033)
This comprehensive report provides an in-depth analysis of the Latin America data center construction market, covering the period from 2019 to 2033. It delves into market dynamics, growth trends, regional variations, key players, and future opportunities, offering crucial insights for industry professionals, investors, and strategists. The report utilizes a robust methodology, incorporating historical data (2019-2024), base year (2025), and estimated and forecast data (2025-2033) to provide a clear and accurate picture of the market's trajectory. The market is segmented by infrastructure type (electrical, mechanical, general construction), tier type (Tier I & II, Tier III, Tier IV), size of enterprise (small & medium, large-scale), end-user (banking, IT & telecommunications, government, healthcare, others), and country (Mexico, Brazil, Argentina, Rest of Latin America).
Latin America Data Center Construction Market Dynamics & Structure
The Latin American data center construction market is experiencing significant growth, driven by increasing digitalization, cloud adoption, and government initiatives to enhance digital infrastructure. Market concentration is relatively low, with several regional and international players competing. Technological innovation, particularly in sustainable and efficient data center designs, is a key driver. Regulatory frameworks vary across countries, impacting investment and development. Competitive substitutes include colocation facilities and cloud services. End-user demographics are shifting towards large-scale enterprises and the IT and telecommunications sectors. M&A activity is rising, as evidenced by the Aligned-Odata deal.
- Market Concentration: Moderately fragmented, with no single dominant player.
- Technological Innovation: Focus on energy efficiency, sustainability, and modular design.
- Regulatory Frameworks: Vary across countries, impacting project timelines and costs.
- Competitive Substitutes: Colocation facilities and cloud services.
- End-User Demographics: Growing demand from large-scale enterprises and IT/Telecom.
- M&A Trends: Increasing consolidation, exemplified by the potential $1.8 Billion Aligned-Odata acquisition (Dec 2022). Deal volume estimated at xx in 2024, projected to reach xx by 2033.
Latin America Data Center Construction Market Growth Trends & Insights
The Latin American data center construction market exhibits robust growth, fueled by expanding digital economies and increasing data consumption. Market size, currently estimated at XXX million in 2025, is projected to reach XXX million by 2033, exhibiting a CAGR of xx%. Adoption rates of advanced technologies like AI and IoT are driving demand. Technological disruptions, such as the rise of edge computing, are reshaping the market landscape. Shifting consumer behavior, with increased reliance on digital services, is further accelerating growth. Factors such as increasing internet penetration, rising smartphone usage, and the growth of e-commerce are all contributing to the expansion of the data center market. Specific metrics such as market penetration rates for different Tier types and enterprise sizes will be analyzed in detail within the full report. Government initiatives promoting digital infrastructure are another significant contributing factor to this growth.

Dominant Regions, Countries, or Segments in Latin America Data Center Construction Market
Brazil and Mexico are currently the dominant markets, accounting for approximately xx% and xx% of the total market share respectively in 2025. The Tier III segment holds the largest share in the Tier type segment, driven by demand for high-reliability infrastructure. Large-scale enterprises represent a major segment in the Size of Enterprise section, due to their significant data storage and processing needs. The IT and telecommunications sector leads in end-user demand, owing to the substantial infrastructure required for their operations. However, the Banking, Financial Services, and Insurance (BFSI) sector is projected to experience high growth.
- Key Drivers in Brazil: Robust economic growth, substantial investments in digital infrastructure, and a large pool of potential customers.
- Key Drivers in Mexico: Government initiatives promoting digitalization, increasing foreign investment in the tech sector, and a growing e-commerce market.
- Tier III Dominance: High reliability requirements of businesses drive demand for Tier III facilities.
- Large-Scale Enterprise Dominance: Significant data storage and processing needs dictate high demand.
- IT & Telecommunications Sector Dominance: High dependence on robust data center infrastructure.
Latin America Data Center Construction Market Product Landscape
The market showcases a diverse range of products, including prefabricated modular data centers, sustainable solutions with enhanced energy efficiency, and advanced cooling technologies. These products are tailored to cater to the specific needs of diverse clients, incorporating features like enhanced security measures, and robust disaster recovery capabilities. Many solutions are designed to minimize environmental impact and meet rising sustainability concerns. This innovation drive is primarily directed towards improving efficiency and reducing total cost of ownership.
Key Drivers, Barriers & Challenges in Latin America Data Center Construction Market
Key Drivers: Increasing data consumption, government initiatives to boost digital infrastructure, rising adoption of cloud computing and edge computing, and strong growth of e-commerce.
Challenges: High infrastructure costs, regulatory hurdles, skilled labor shortages, and competition from international players. Supply chain disruptions, particularly concerning specialized components, can impact project timelines and overall costs. Estimated xx% project delays were experienced in 2024 due to such disruptions.
Emerging Opportunities in Latin America Data Center Construction Market
Untapped markets in smaller Latin American countries, increased demand for edge data centers to support IoT deployments, and the potential for growth in specialized data center solutions for specific industries (e.g., healthcare, finance) represent significant opportunities. The development of sustainable and environmentally friendly data centers is also expected to see a surge in demand and innovation.
Growth Accelerators in the Latin America Data Center Construction Market Industry
Technological advancements in data center design and construction, strategic partnerships between technology providers and construction firms, and government incentives to attract foreign investment are vital growth accelerators. The expansion of hyperscale data centers in key markets will further fuel the market's expansion in the coming years.
Key Players Shaping the Latin America Data Center Construction Market Market
- Ascenty Data Centers E Telecomunicacoes
- Constructora Sudamericana S A
- Fortis Construction
- Equnix Inc
- Aceco TI
- Delta Group
- Turner Construction Co
- ZFB Group
- DPR Construction Inc
- HostDime Brasil
- AECOM Limited
- Legrand
- CyrusOne Inc
- RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG)
Notable Milestones in Latin America Data Center Construction Market Sector
- January 2023: The Santos Port Authority (SPA) contracts Zeittec for a new data center in Santos, Brazil, emphasizing fire and security features.
- December 2022: Aligned (Macquarie Group-backed) plans to acquire Odata for ~$1.8 billion, signaling further market consolidation and expansion into Mexico and Peru.
In-Depth Latin America Data Center Construction Market Market Outlook
The Latin American data center construction market is poised for continued expansion, driven by factors such as increasing digital adoption, supportive government policies, and burgeoning investments in digital infrastructure. Strategic partnerships and technological advancements will further shape the market landscape, presenting significant opportunities for players who can effectively navigate the challenges and capitalize on the region's growth potential. The market is expected to see a sustained expansion, with opportunities in both established and emerging markets within the region.
Latin America Data Center Construction Market Segmentation
-
1. Infrastructure Type
-
1.1. Electrical Infrastructure
- 1.1.1. UPS Systems
- 1.1.2. Others Electrical Infrastructure
-
1.2. Mechanical Infrastructure
- 1.2.1. Cooling Systems
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
- 1.3. General Construction
-
1.1. Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier-I and II
- 2.2. Tier-III
- 2.3. Tier-IV
-
3. Size of Enterprise
- 3.1. Small and Medium-scale Enterprise
- 3.2. Large-Scale Enterprise
-
4. End User
- 4.1. Banking, Financial Services, and Insurance
- 4.2. IT and Telecommunications
- 4.3. Government and Defense
- 4.4. Healthcare
- 4.5. Other End Users
Latin America Data Center Construction Market Segmentation By Geography
-
1. Latin America
- 1.1. Brazil
- 1.2. Argentina
- 1.3. Chile
- 1.4. Colombia
- 1.5. Mexico
- 1.6. Peru
- 1.7. Venezuela
- 1.8. Ecuador
- 1.9. Bolivia
- 1.10. Paraguay

Latin America Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of > 8.71% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Growth in Network Connectivity and Increased Adoption of Digital Transformation Related Technologies in the Region; Favorable tax Incentive Structure Introduced by Local Governments has Led to the Higher Participation from International Players; Ongoing Consolidation Efforts by Major Data Center Construction Companies to Aid their Expansion Activities; Growing Awareness on Modular Deployments and Increasing Rack Density
- 3.3. Market Restrains
- 3.3.1. Integration issues with traditional systems; Data quality and accuracy issues
- 3.4. Market Trends
- 3.4.1. IT and Telecommunications Segment to Hold a Significant Share of the Market
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure Type
- 5.1.1. Electrical Infrastructure
- 5.1.1.1. UPS Systems
- 5.1.1.2. Others Electrical Infrastructure
- 5.1.2. Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.3. General Construction
- 5.1.1. Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier-I and II
- 5.2.2. Tier-III
- 5.2.3. Tier-IV
- 5.3. Market Analysis, Insights and Forecast - by Size of Enterprise
- 5.3.1. Small and Medium-scale Enterprise
- 5.3.2. Large-Scale Enterprise
- 5.4. Market Analysis, Insights and Forecast - by End User
- 5.4.1. Banking, Financial Services, and Insurance
- 5.4.2. IT and Telecommunications
- 5.4.3. Government and Defense
- 5.4.4. Healthcare
- 5.4.5. Other End Users
- 5.5. Market Analysis, Insights and Forecast - by Region
- 5.5.1. Latin America
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure Type
- 6. Brazil Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7. Argentina Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8. Mexico Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9. Peru Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Chile Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Rest of Latin America Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Competitive Analysis
- 12.1. Market Share Analysis 2024
- 12.2. Company Profiles
- 12.2.1 Ascenty Data Centers E Telecomunicacoes
- 12.2.1.1. Overview
- 12.2.1.2. Products
- 12.2.1.3. SWOT Analysis
- 12.2.1.4. Recent Developments
- 12.2.1.5. Financials (Based on Availability)
- 12.2.2 Constructora Sudamericana S A
- 12.2.2.1. Overview
- 12.2.2.2. Products
- 12.2.2.3. SWOT Analysis
- 12.2.2.4. Recent Developments
- 12.2.2.5. Financials (Based on Availability)
- 12.2.3 Fortis Construction
- 12.2.3.1. Overview
- 12.2.3.2. Products
- 12.2.3.3. SWOT Analysis
- 12.2.3.4. Recent Developments
- 12.2.3.5. Financials (Based on Availability)
- 12.2.4 Equnix Inc *List Not Exhaustive
- 12.2.4.1. Overview
- 12.2.4.2. Products
- 12.2.4.3. SWOT Analysis
- 12.2.4.4. Recent Developments
- 12.2.4.5. Financials (Based on Availability)
- 12.2.5 Aceco TI
- 12.2.5.1. Overview
- 12.2.5.2. Products
- 12.2.5.3. SWOT Analysis
- 12.2.5.4. Recent Developments
- 12.2.5.5. Financials (Based on Availability)
- 12.2.6 Delta Group
- 12.2.6.1. Overview
- 12.2.6.2. Products
- 12.2.6.3. SWOT Analysis
- 12.2.6.4. Recent Developments
- 12.2.6.5. Financials (Based on Availability)
- 12.2.7 Turner Construction Co
- 12.2.7.1. Overview
- 12.2.7.2. Products
- 12.2.7.3. SWOT Analysis
- 12.2.7.4. Recent Developments
- 12.2.7.5. Financials (Based on Availability)
- 12.2.8 ZFB Group
- 12.2.8.1. Overview
- 12.2.8.2. Products
- 12.2.8.3. SWOT Analysis
- 12.2.8.4. Recent Developments
- 12.2.8.5. Financials (Based on Availability)
- 12.2.9 DPR Construction Inc
- 12.2.9.1. Overview
- 12.2.9.2. Products
- 12.2.9.3. SWOT Analysis
- 12.2.9.4. Recent Developments
- 12.2.9.5. Financials (Based on Availability)
- 12.2.10 HostDime Brasil
- 12.2.10.1. Overview
- 12.2.10.2. Products
- 12.2.10.3. SWOT Analysis
- 12.2.10.4. Recent Developments
- 12.2.10.5. Financials (Based on Availability)
- 12.2.11 AECOM Limited
- 12.2.11.1. Overview
- 12.2.11.2. Products
- 12.2.11.3. SWOT Analysis
- 12.2.11.4. Recent Developments
- 12.2.11.5. Financials (Based on Availability)
- 12.2.12 Legrand
- 12.2.12.1. Overview
- 12.2.12.2. Products
- 12.2.12.3. SWOT Analysis
- 12.2.12.4. Recent Developments
- 12.2.12.5. Financials (Based on Availability)
- 12.2.13 CyrusOne Inc
- 12.2.13.1. Overview
- 12.2.13.2. Products
- 12.2.13.3. SWOT Analysis
- 12.2.13.4. Recent Developments
- 12.2.13.5. Financials (Based on Availability)
- 12.2.14 RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG)
- 12.2.14.1. Overview
- 12.2.14.2. Products
- 12.2.14.3. SWOT Analysis
- 12.2.14.4. Recent Developments
- 12.2.14.5. Financials (Based on Availability)
- 12.2.1 Ascenty Data Centers E Telecomunicacoes
List of Figures
- Figure 1: Latin America Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Latin America Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Latin America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Latin America Data Center Construction Market Revenue Million Forecast, by Infrastructure Type 2019 & 2032
- Table 3: Latin America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 4: Latin America Data Center Construction Market Revenue Million Forecast, by Size of Enterprise 2019 & 2032
- Table 5: Latin America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 6: Latin America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 7: Latin America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 8: Brazil Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 9: Argentina Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 10: Mexico Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 11: Peru Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 12: Chile Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 13: Rest of Latin America Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 14: Latin America Data Center Construction Market Revenue Million Forecast, by Infrastructure Type 2019 & 2032
- Table 15: Latin America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 16: Latin America Data Center Construction Market Revenue Million Forecast, by Size of Enterprise 2019 & 2032
- Table 17: Latin America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 18: Latin America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 19: Brazil Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 20: Argentina Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 21: Chile Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 22: Colombia Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 23: Mexico Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 24: Peru Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 25: Venezuela Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 26: Ecuador Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 27: Bolivia Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 28: Paraguay Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Latin America Data Center Construction Market?
The projected CAGR is approximately > 8.71%.
2. Which companies are prominent players in the Latin America Data Center Construction Market?
Key companies in the market include Ascenty Data Centers E Telecomunicacoes, Constructora Sudamericana S A, Fortis Construction, Equnix Inc *List Not Exhaustive, Aceco TI, Delta Group, Turner Construction Co, ZFB Group, DPR Construction Inc, HostDime Brasil, AECOM Limited, Legrand, CyrusOne Inc, RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG).
3. What are the main segments of the Latin America Data Center Construction Market?
The market segments include Infrastructure Type, Tier Type, Size of Enterprise, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD 5.14 Million as of 2022.
5. What are some drivers contributing to market growth?
Growth in Network Connectivity and Increased Adoption of Digital Transformation Related Technologies in the Region; Favorable tax Incentive Structure Introduced by Local Governments has Led to the Higher Participation from International Players; Ongoing Consolidation Efforts by Major Data Center Construction Companies to Aid their Expansion Activities; Growing Awareness on Modular Deployments and Increasing Rack Density.
6. What are the notable trends driving market growth?
IT and Telecommunications Segment to Hold a Significant Share of the Market.
7. Are there any restraints impacting market growth?
Integration issues with traditional systems; Data quality and accuracy issues.
8. Can you provide examples of recent developments in the market?
January 2023: The Santos Port Authority (SPA) is planning to have a new data center constructed by the Brazilian company Zeittec. Zeittec and the SPA, the state-owned organization in charge of running the Port of Santos in the state of So Paulo, have agreed to the terms of a building agreement for a new data center. It is anticipated that work on the Safe Room will begin in January and be finished in the middle of 2023. According to the firm, the SPA Safe Room will be safe from both break-ins and fires thanks to walls that have been certified by NBR 10.636 as being able to resist fire for up to 120 minutes (CF 120). It will have OM4 laser multimode optical fibers and CAT 6A structured cabling.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 4950, and USD 6800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Latin America Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Latin America Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Latin America Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Latin America Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence