Key Insights
The Israel data center construction market is experiencing robust growth, fueled by a burgeoning digital economy and increasing demand for cloud services. The market's Compound Annual Growth Rate (CAGR) of 9.55% from 2019-2033 indicates a significant expansion, driven primarily by the IT & Telecommunication, BFSI (Banking, Financial Services, and Insurance), and Government sectors. These sectors are investing heavily in data center infrastructure to support digital transformation initiatives, enhance cybersecurity, and meet growing data storage needs. Furthermore, the increasing adoption of edge computing and the rise of hyperscale data centers are contributing to this market expansion. The market is segmented by infrastructure type (electrical and mechanical) and end-user industries, reflecting the diverse needs of various sectors. Key players like ABB Ltd, Schneider Electric SE, and others are actively participating in this growth, offering advanced solutions and services. While specific market size figures for 2025 are not provided, considering the 9.55% CAGR and a typical growth trajectory for data center markets, a reasonable estimate for 2025 would place the Israel data center construction market value in the range of $150-200 million, depending on factors like government regulations and investment trends.
Looking ahead to the forecast period (2025-2033), the market is poised for continued expansion, albeit potentially at a slightly moderated pace due to global economic uncertainties and potential infrastructure limitations. However, ongoing investments in digital infrastructure by the Israeli government and the growing presence of multinational technology companies in the region suggest strong potential for sustained growth. The market will likely witness increasing demand for sustainable and energy-efficient data center solutions, driving innovation in cooling technologies and power management systems. Competition among major players will remain intense, with a focus on providing customized solutions and superior service to meet the specific requirements of different clients. The increasing adoption of prefabricated modular data centers is expected to further shape the market landscape, offering faster deployment and cost efficiencies.

Israel Data Center Construction Market: A Comprehensive Market Report (2019-2033)
This comprehensive report provides a detailed analysis of the Israel Data Center Construction Market, encompassing market dynamics, growth trends, key players, and future outlook. With a study period spanning 2019-2033, a base year of 2025, and a forecast period of 2025-2033, this report is an essential resource for industry professionals, investors, and stakeholders seeking to understand and capitalize on the opportunities within this rapidly evolving sector. The report segments the market by infrastructure (Electrical Infrastructure, Mechanical Infrastructure, Other Infrastructures), end-user (IT & Telecommunication, BFSI, Government, Healthcare, Other End Users), and other mechanical infrastructures. The total market size is predicted to reach xx Million by 2033.
Israel Data Center Construction Market Dynamics & Structure
The Israeli data center construction market is characterized by moderate concentration, with a few major players holding significant market share, while numerous smaller companies contribute to the overall activity. Technological innovation, driven by increasing demand for high-performance computing and cloud services, is a key growth driver. The regulatory framework, while supportive of technological advancement, presents certain challenges related to land acquisition and permitting. Competitive product substitutes are limited, given the specialized nature of data center infrastructure. The end-user demographic is diverse, with significant contributions from the IT & Telecommunication, BFSI, and Government sectors. M&A activity has been noticeable, with larger players acquiring smaller firms to expand their market footprint and technological capabilities.
- Market Concentration: Moderately concentrated, with top 5 players holding approximately xx% market share in 2024.
- Technological Innovation: Strong driver, fueled by demand for edge computing and increased data storage needs.
- Regulatory Framework: Supportive but presents challenges in permitting and land acquisition.
- M&A Activity: Significant activity observed in recent years, with deals valued at an estimated xx Million annually.
- End-User Demographics: IT & Telecommunication, BFSI, and Government sectors are key drivers of market growth.
Israel Data Center Construction Market Growth Trends & Insights
The Israeli data center construction market has experienced substantial growth in recent years, driven by the increasing adoption of cloud computing, big data analytics, and the proliferation of internet-connected devices. This trend is expected to continue throughout the forecast period, with a projected Compound Annual Growth Rate (CAGR) of xx% between 2025 and 2033. Market penetration is high in urban centers, particularly Tel Aviv and surrounding areas, but considerable opportunities exist in secondary cities. Technological disruptions, such as the rise of AI and IoT, are further driving market expansion. Consumer behavior shifts, reflecting the growing reliance on digital services, reinforce this positive outlook. Market size is estimated at xx Million in 2025 and projected to reach xx Million by 2033.

Dominant Regions, Countries, or Segments in Israel Data Center Construction Market
The Tel Aviv metropolitan area dominates the Israeli data center construction market, driven by high concentrations of IT companies, financial institutions, and government agencies. This region benefits from robust infrastructure, skilled labor, and strong investor interest. The IT & Telecommunication sector is the largest end-user segment, accounting for approximately xx% of the market in 2024. This is fueled by the expanding digital economy and increasing demand for high-capacity data centers. The Electrical Infrastructure segment holds the largest market share within the infrastructure category, with xx% in 2024. Government initiatives to boost digital infrastructure further fuel this dominance.
- Tel Aviv Metropolitan Area: Dominant region due to high concentration of tech companies and robust infrastructure.
- IT & Telecommunication Sector: Largest end-user segment, driven by increasing digital adoption and cloud computing.
- Electrical Infrastructure: Largest infrastructure segment, driven by power requirements of modern data centers.
- Government Initiatives: Significant investments in digital infrastructure are driving market expansion.
Israel Data Center Construction Market Product Landscape
The product landscape in the Israeli data center construction market is characterized by advanced technologies, including modular designs, prefabricated components, and energy-efficient solutions. These innovations aim to reduce construction time, improve operational efficiency, and enhance sustainability. The focus is on high-availability, fault-tolerant systems that ensure continuous operation and data security. Unique selling propositions include optimized cooling solutions, robust security features, and compliance with stringent industry standards.
Key Drivers, Barriers & Challenges in Israel Data Center Construction Market
Key Drivers: Increased adoption of cloud computing and big data, growing demand for high-performance computing, government initiatives promoting digital infrastructure, and foreign investments in the Israeli tech sector.
Challenges: Land scarcity and high real estate costs, regulatory hurdles related to construction permits and environmental regulations, competition from established international players, and supply chain disruptions affecting the availability of critical components. The estimated cost impact of supply chain disruptions in 2024 was xx Million.
Emerging Opportunities in Israel Data Center Construction Market
Emerging opportunities include the expansion of edge data centers to meet the needs of IoT devices and the growing adoption of sustainable and energy-efficient data center technologies. The increasing demand for colocation services presents further opportunities for specialized data center providers. Untapped markets exist in secondary cities and regions outside of the Tel Aviv metropolitan area.
Growth Accelerators in the Israel Data Center Construction Market Industry
Technological breakthroughs in areas such as AI-powered energy management and advanced cooling systems are key growth accelerators. Strategic partnerships between construction firms, technology providers, and data center operators are also driving market expansion. The government’s commitment to improving digital infrastructure further accelerates growth, creating a favorable environment for investment and expansion.
Key Players Shaping the Israel Data Center Construction Market Market
- ABB Ltd
- Fortis Construction
- STULZ GMBH
- Saan Zahav
- Delta Group
- Schneider Electric SE
- Turner Construction Co
- DPR Construction Inc
- Caterpillar Inc
- Rittal GmbH & Co KG
- Delta Electronics
- STULZ GMB
- Mercury Engineering
- AECOM Limited
- Legrand
- CyrusOne Inc
- AECOM
- Canovate Group
- EAE Group
- Alfa Laval AB
- M+W Group (Exyte)
Notable Milestones in Israel Data Center Construction Market Sector
- August 2021: EdgeConneX acquired Global Data Center (GDC), adding two facilities to its platform.
- July 2022: Berkshire Partners invested USD 215 million in MedOne, valuing the company at USD 430 Million.
In-Depth Israel Data Center Construction Market Outlook
The future of the Israeli data center construction market is promising, driven by sustained growth in the digital economy and ongoing government investments. Strategic opportunities exist for companies that can leverage technological innovation, form strategic partnerships, and capitalize on the growing demand for sustainable and efficient data center solutions. The market's continued expansion is poised for significant growth in the coming years, offering substantial opportunities for both domestic and international players.
Israel Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Panels and Components
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-voltage
- 2.1.3.2. Medium-voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Panels and Components
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-voltage
- 3.3.2. Medium-voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Panels and Components
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 1 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 1 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Israel Data Center Construction Market Segmentation By Geography
- 1. Israel

Israel Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 9.55% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 9.1 Rising Adoption of Renewable Energy Sources9.2 Increase in 5G Deployments Fueling Edge Data Center Investments9.3 Smart City Initiatives Driving Data Center Investments
- 3.3. Market Restrains
- 3.3.1. 10.1 Security Challenges in Data Centers10.2 Location Constraints on the Development of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Israel Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Panels and Components
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-voltage
- 5.2.1.3.2. Medium-voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Panels and Components
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-voltage
- 5.3.3.2. Medium-voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Panels and Components
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 1 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Israel
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 ABB Ltd
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Fortis Construction
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 STULZ GMBH
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Saan Zahav
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Delta Group
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Schneider Electric SE
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Turner Construction Co
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 DPR Construction Inc
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Caterpillar Inc
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Rittal GmbH & Co KG
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Delta Electronics
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 STULZ GMB
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Mercury Engineering
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 AECOM Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 Legrand
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 CyrusOne Inc
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 AECOM
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.18 Canovate Group
- 6.2.18.1. Overview
- 6.2.18.2. Products
- 6.2.18.3. SWOT Analysis
- 6.2.18.4. Recent Developments
- 6.2.18.5. Financials (Based on Availability)
- 6.2.19 EAE Group
- 6.2.19.1. Overview
- 6.2.19.2. Products
- 6.2.19.3. SWOT Analysis
- 6.2.19.4. Recent Developments
- 6.2.19.5. Financials (Based on Availability)
- 6.2.20 Alfa Laval AB
- 6.2.20.1. Overview
- 6.2.20.2. Products
- 6.2.20.3. SWOT Analysis
- 6.2.20.4. Recent Developments
- 6.2.20.5. Financials (Based on Availability)
- 6.2.21 M+W Group (Exyte)
- 6.2.21.1. Overview
- 6.2.21.2. Products
- 6.2.21.3. SWOT Analysis
- 6.2.21.4. Recent Developments
- 6.2.21.5. Financials (Based on Availability)
- 6.2.1 ABB Ltd
List of Figures
- Figure 1: Israel Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Israel Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Israel Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Israel Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Israel Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Israel Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Israel Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Israel Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Israel Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Israel Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Israel Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Israel Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Israel Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Israel Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Israel Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 14: Israel Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Israel Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Israel Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Israel Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Israel Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Israel Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Israel Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Israel Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Israel Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 23: Israel Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: Israel Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 25: Israel Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 26: Israel Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 27: Israel Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 28: Israel Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 29: Israel Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 30: Israel Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 31: Israel Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 32: Israel Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 33: Israel Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 34: Israel Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 35: Israel Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 36: Israel Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 37: Israel Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 38: Israel Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 39: Israel Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 40: Israel Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 41: Israel Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 42: Israel Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 43: Israel Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 44: Israel Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Israel Data Center Construction Market?
The projected CAGR is approximately 9.55%.
2. Which companies are prominent players in the Israel Data Center Construction Market?
Key companies in the market include ABB Ltd, Fortis Construction, STULZ GMBH, Saan Zahav, Delta Group, Schneider Electric SE, Turner Construction Co, DPR Construction Inc, Caterpillar Inc, Rittal GmbH & Co KG, Delta Electronics, STULZ GMB, Mercury Engineering, AECOM Limited, Legrand, CyrusOne Inc, AECOM, Canovate Group, EAE Group, Alfa Laval AB, M+W Group (Exyte).
3. What are the main segments of the Israel Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Rising Adoption of Renewable Energy Sources9.2 Increase in 5G Deployments Fueling Edge Data Center Investments9.3 Smart City Initiatives Driving Data Center Investments.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
10.1 Security Challenges in Data Centers10.2 Location Constraints on the Development of Data Centers.
8. Can you provide examples of recent developments in the market?
July 2022: Berkshire Partners announced to pay more than USD 215 million to acquire a 49% stake in MedOne. The company was evaluated at NIS 1.5 billion (USD 430 Million).
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Israel Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Israel Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Israel Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Israel Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence