Key Insights
The Middle East data center construction market is experiencing robust growth, driven by a surge in digital transformation initiatives across various sectors, including IT & telecommunications, BFSI, and government. The region's burgeoning population, increasing internet penetration, and the adoption of cloud computing and big data analytics are key catalysts fueling this expansion. A 14.74% CAGR from 2019 to 2024 indicates a significant market expansion, and this trajectory is expected to continue through 2033. While precise market size figures for 2019-2024 are unavailable, a reasonable estimate based on the provided 2025 market value and CAGR suggests substantial growth throughout the historical period. The increasing demand for reliable and scalable infrastructure to support these technological advancements is driving significant investment in data center construction. This demand is further accentuated by government initiatives promoting digital economies and the establishment of smart cities across the region. The market is segmented by tier type (Tier 1-4), data center size (small to massive), infrastructure components (cooling, power, security, etc.), and end-user industries. The significant players in this market include international construction firms, technology vendors, and specialized data center builders. Competitive pressures are likely driving innovation in sustainable and efficient data center design and construction.
Challenges remain, however. High energy costs in some parts of the Middle East can increase operational expenses for data centers. Furthermore, securing skilled labor and navigating regulatory complexities can pose obstacles to project completion and timelines. Despite these hurdles, the long-term outlook for the Middle East data center construction market remains exceptionally positive. The continued growth of digital economies, coupled with substantial investments in infrastructure development, will ensure sustained demand for data center construction services in the coming years. The market's segmentation highlights the opportunities for specialized service providers focusing on specific infrastructure needs or end-user industries. The diversification of the market across the Middle East – including the UAE, Saudi Arabia, Qatar, Israel, Egypt, Oman, and other nations – also presents considerable opportunities for players targeting specific regional needs.

Middle East Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the Middle East data center construction market, encompassing market dynamics, growth trends, dominant segments, key players, and future outlook. With a study period spanning 2019-2033, a base year of 2025, and a forecast period of 2025-2033, this report is an invaluable resource for industry professionals, investors, and stakeholders seeking to understand and capitalize on the burgeoning opportunities within this dynamic sector. The report also examines parent markets (e.g., Middle East construction, IT infrastructure) and child markets (e.g., specific data center components and services) to offer a nuanced perspective. The market value is presented in million units.
Middle East Data Center Construction Market Dynamics & Structure
The Middle East data center construction market is characterized by a moderately concentrated landscape, with a few large multinational players alongside several regional contractors. Technological innovation, driven by increasing demand for higher capacity, energy efficiency, and enhanced security, is a key driver. Stringent regulatory frameworks, varying across countries in the region, impact construction standards and compliance. While traditional construction methods remain prevalent, the adoption of modular and prefabricated data center designs is gaining traction. The market witnesses substantial M&A activity, with larger players consolidating their position.
- Market Concentration: The top 5 players hold approximately xx% of the market share in 2025.
- Technological Innovation: Focus on sustainable practices like utilizing renewable energy sources and implementing advanced cooling technologies is pushing innovation.
- Regulatory Landscape: Compliance with local building codes and data privacy regulations significantly influence project timelines and costs.
- Competitive Substitutes: The emergence of cloud computing and colocation services presents some degree of substitution, however, on-premise data center construction remains crucial for many sectors.
- End-User Demographics: The IT & Telecommunications sector is the largest end-user, followed by BFSI and Government.
- M&A Trends: An average of xx M&A deals were concluded annually in the historical period (2019-2024), indicating a significant level of consolidation.
Middle East Data Center Construction Market Growth Trends & Insights
The Middle East data center construction market exhibits robust growth, driven by rapid digital transformation, increasing data consumption, and the expansion of cloud services across various sectors. The market size is estimated at xx Million in 2025 and is projected to reach xx Million by 2033, registering a CAGR of xx% during the forecast period (2025-2033). This growth is fuelled by the adoption of advanced technologies, such as AI and IoT, that significantly increase the demand for data processing capabilities. Consumer behavior shifts towards digital services are further reinforcing this trend. Technological disruptions, such as the rise of edge computing, are reshaping the data center landscape, leading to a greater focus on decentralized infrastructure.

Dominant Regions, Countries, or Segments in Middle East Data Center Construction Market
The UAE and Saudi Arabia are the leading markets, accounting for approximately xx% of the total market value in 2025. This dominance is attributed to robust government investments in digital infrastructure, favorable economic policies, and a growing concentration of major technology companies. The segment driving the most growth is the construction of large and mega data centers, primarily driven by hyperscale providers. Within infrastructure, cooling infrastructure and Power Distribution Units (PDUs) are the fastest-growing segments. The IT and Telecommunications sector remains the primary end-user segment.
- Key Drivers:
- Favorable government policies and investment in digital infrastructure.
- Increasing digitalization across various sectors.
- Growth of cloud computing and the establishment of hyperscale data centers.
- Dominance Factors:
- Strong economic growth in the UAE and Saudi Arabia.
- Strategic location facilitating regional connectivity.
- Supportive regulatory frameworks in certain areas.
Middle East Data Center Construction Market Product Landscape
The product landscape is evolving with innovations in cooling technologies (e.g., liquid cooling, adiabatic cooling), power infrastructure (e.g., increased power density solutions), and security systems (e.g., biometric access control, advanced surveillance). These advancements prioritize energy efficiency, scalability, and robust security, catering to the increasing demands of modern data centers. Modular data center designs, offering faster deployment and reduced construction time, are gaining significant traction. Unique selling propositions focus on sustainability, resilience, and operational efficiency.
Key Drivers, Barriers & Challenges in Middle East Data Center Construction Market
Key Drivers:
- Growing demand for data storage and processing due to digital transformation.
- Government initiatives to develop digital economies and attract investment in technology.
- Expansion of cloud computing and the emergence of hyperscale data centers.
Challenges & Restraints:
- High construction costs and land scarcity in certain areas.
- Potential for supply chain disruptions impacting project timelines.
- Stringent regulatory compliance requirements, which can increase complexity.
- Competition from established regional and international players. This competition can result in a xx% reduction in average profit margins.
Emerging Opportunities in Middle East Data Center Construction Market
- Expansion into underserved markets within the Middle East.
- Growth of edge computing and the need for localized data centers.
- Increased demand for sustainable and environmentally friendly data center designs.
- Development of specialized data centers for specific sectors (e.g., healthcare, finance).
Growth Accelerators in the Middle East Data Center Construction Market Industry
Technological breakthroughs in areas such as AI-powered cooling systems and renewable energy integration are poised to significantly enhance the efficiency and sustainability of data centers. Strategic partnerships between technology providers, construction firms, and energy companies are crucial in driving innovation and market expansion. A focus on developing resilient infrastructure capable of withstanding extreme weather conditions is crucial in the long-term development of the market.
Key Players Shaping the Middle East Data Center Construction Market Market
- Canovate S A
- ABB Ltd
- Johnson Controls International PLC
- Fortis Construction
- STULZ GMBH
- Delta Group
- Schneider Electric SE
- Turner Construction Co
- DPR Construction Inc
- Caterpillar Inc
- Airedale International Air Conditioning Ltd
- Cummins Inc
- AECOM Limited
- Legrand
- CyrusOne Inc
- Future Digital data Systems
- Ashi & Bushnag Co Ltd
- EAE Group
- Alfa Laval AB
- Saan Zahav Ltd
Notable Milestones in Middle East Data Center Construction Market Sector
- October 2022: Launch of M-VAULT 4's fourth data center building in Qatar, expanding cloud services access.
- October 2022: Agreement between Khazna Data Centers and Masdar/EDF to construct a solar PV plant, highlighting the move towards sustainable data center operations.
In-Depth Middle East Data Center Construction Market Outlook
The Middle East data center construction market is poised for sustained growth, driven by the region's ongoing digital transformation, the expanding adoption of cloud services, and increasing investments in digital infrastructure. Strategic partnerships, technological advancements, and a focus on sustainable solutions will shape the market's trajectory. Opportunities exist for companies to capitalize on the growing demand for energy-efficient, secure, and resilient data center infrastructure across various sectors. The focus on sustainable solutions will be a key differentiator in this market.
Middle East Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched Solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 1 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 1 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
- 21. United Arab Emirates
- 22. Saudi Arabia
- 23. Israel
- 24. Qatar
- 25. Oman
Middle East Data Center Construction Market Segmentation By Geography
-
1. Middle East
- 1.1. Saudi Arabia
- 1.2. United Arab Emirates
- 1.3. Israel
- 1.4. Qatar
- 1.5. Kuwait
- 1.6. Oman
- 1.7. Bahrain
- 1.8. Jordan
- 1.9. Lebanon

Middle East Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 14.74% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Rising Adoption of Renewable Energy Sources; Increase in 5G Deployments Fueling Edge Data Center Investments; Smart City Initiatives Driving Data Center Investments
- 3.3. Market Restrains
- 3.3.1. Security Challenges in Data Centers; Location Constraints on the Development of Data Centers
- 3.4. Market Trends
- 3.4.1. End-User Outlook
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 1 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by United Arab Emirates
- 5.22. Market Analysis, Insights and Forecast - by Saudi Arabia
- 5.23. Market Analysis, Insights and Forecast - by Israel
- 5.24. Market Analysis, Insights and Forecast - by Qatar
- 5.25. Market Analysis, Insights and Forecast - by Oman
- 5.26. Market Analysis, Insights and Forecast - by Region
- 5.26.1. Middle East
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. United Arab Emirates Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7. Saudi Arabia Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8. Qatar Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9. Israel Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Egypt Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Oman Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Rest of Middle East Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13. Competitive Analysis
- 13.1. Market Share Analysis 2024
- 13.2. Company Profiles
- 13.2.1 Canovate S A
- 13.2.1.1. Overview
- 13.2.1.2. Products
- 13.2.1.3. SWOT Analysis
- 13.2.1.4. Recent Developments
- 13.2.1.5. Financials (Based on Availability)
- 13.2.2 ABB Ltd
- 13.2.2.1. Overview
- 13.2.2.2. Products
- 13.2.2.3. SWOT Analysis
- 13.2.2.4. Recent Developments
- 13.2.2.5. Financials (Based on Availability)
- 13.2.3 Johnson Controls International PLC
- 13.2.3.1. Overview
- 13.2.3.2. Products
- 13.2.3.3. SWOT Analysis
- 13.2.3.4. Recent Developments
- 13.2.3.5. Financials (Based on Availability)
- 13.2.4 Fortis Construction
- 13.2.4.1. Overview
- 13.2.4.2. Products
- 13.2.4.3. SWOT Analysis
- 13.2.4.4. Recent Developments
- 13.2.4.5. Financials (Based on Availability)
- 13.2.5 STULZ GMBH
- 13.2.5.1. Overview
- 13.2.5.2. Products
- 13.2.5.3. SWOT Analysis
- 13.2.5.4. Recent Developments
- 13.2.5.5. Financials (Based on Availability)
- 13.2.6 Delta Group
- 13.2.6.1. Overview
- 13.2.6.2. Products
- 13.2.6.3. SWOT Analysis
- 13.2.6.4. Recent Developments
- 13.2.6.5. Financials (Based on Availability)
- 13.2.7 Schneider Electric SE
- 13.2.7.1. Overview
- 13.2.7.2. Products
- 13.2.7.3. SWOT Analysis
- 13.2.7.4. Recent Developments
- 13.2.7.5. Financials (Based on Availability)
- 13.2.8 Turner Construction Co
- 13.2.8.1. Overview
- 13.2.8.2. Products
- 13.2.8.3. SWOT Analysis
- 13.2.8.4. Recent Developments
- 13.2.8.5. Financials (Based on Availability)
- 13.2.9 DPR Construction Inc
- 13.2.9.1. Overview
- 13.2.9.2. Products
- 13.2.9.3. SWOT Analysis
- 13.2.9.4. Recent Developments
- 13.2.9.5. Financials (Based on Availability)
- 13.2.10 Caterpillar Inc
- 13.2.10.1. Overview
- 13.2.10.2. Products
- 13.2.10.3. SWOT Analysis
- 13.2.10.4. Recent Developments
- 13.2.10.5. Financials (Based on Availability)
- 13.2.11 Airedale International Air Conditioning Ltd
- 13.2.11.1. Overview
- 13.2.11.2. Products
- 13.2.11.3. SWOT Analysis
- 13.2.11.4. Recent Developments
- 13.2.11.5. Financials (Based on Availability)
- 13.2.12 Cummins Inc
- 13.2.12.1. Overview
- 13.2.12.2. Products
- 13.2.12.3. SWOT Analysis
- 13.2.12.4. Recent Developments
- 13.2.12.5. Financials (Based on Availability)
- 13.2.13 AECOM Limited
- 13.2.13.1. Overview
- 13.2.13.2. Products
- 13.2.13.3. SWOT Analysis
- 13.2.13.4. Recent Developments
- 13.2.13.5. Financials (Based on Availability)
- 13.2.14 Legrand
- 13.2.14.1. Overview
- 13.2.14.2. Products
- 13.2.14.3. SWOT Analysis
- 13.2.14.4. Recent Developments
- 13.2.14.5. Financials (Based on Availability)
- 13.2.15 CyrusOne Inc
- 13.2.15.1. Overview
- 13.2.15.2. Products
- 13.2.15.3. SWOT Analysis
- 13.2.15.4. Recent Developments
- 13.2.15.5. Financials (Based on Availability)
- 13.2.16 Future Digital data Systems
- 13.2.16.1. Overview
- 13.2.16.2. Products
- 13.2.16.3. SWOT Analysis
- 13.2.16.4. Recent Developments
- 13.2.16.5. Financials (Based on Availability)
- 13.2.17 Ashi & Bushnag Co Ltd
- 13.2.17.1. Overview
- 13.2.17.2. Products
- 13.2.17.3. SWOT Analysis
- 13.2.17.4. Recent Developments
- 13.2.17.5. Financials (Based on Availability)
- 13.2.18 EAE Group
- 13.2.18.1. Overview
- 13.2.18.2. Products
- 13.2.18.3. SWOT Analysis
- 13.2.18.4. Recent Developments
- 13.2.18.5. Financials (Based on Availability)
- 13.2.19 Alfa Laval AB
- 13.2.19.1. Overview
- 13.2.19.2. Products
- 13.2.19.3. SWOT Analysis
- 13.2.19.4. Recent Developments
- 13.2.19.5. Financials (Based on Availability)
- 13.2.20 Saan Zahav Ltd
- 13.2.20.1. Overview
- 13.2.20.2. Products
- 13.2.20.3. SWOT Analysis
- 13.2.20.4. Recent Developments
- 13.2.20.5. Financials (Based on Availability)
- 13.2.1 Canovate S A
List of Figures
- Figure 1: Middle East Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Middle East Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Middle East Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Middle East Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Middle East Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Middle East Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Middle East Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Middle East Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Middle East Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Middle East Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Middle East Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Middle East Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Middle East Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Middle East Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 14: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Middle East Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Middle East Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Middle East Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Middle East Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Middle East Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Middle East Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Middle East Data Center Construction Market Revenue Million Forecast, by United Arab Emirates 2019 & 2032
- Table 23: Middle East Data Center Construction Market Revenue Million Forecast, by Saudi Arabia 2019 & 2032
- Table 24: Middle East Data Center Construction Market Revenue Million Forecast, by Israel 2019 & 2032
- Table 25: Middle East Data Center Construction Market Revenue Million Forecast, by Qatar 2019 & 2032
- Table 26: Middle East Data Center Construction Market Revenue Million Forecast, by Oman 2019 & 2032
- Table 27: Middle East Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 28: Middle East Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 29: United Arab Emirates Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 30: Saudi Arabia Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 31: Qatar Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 32: Israel Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 33: Egypt Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 34: Oman Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 35: Rest of Middle East Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 36: Middle East Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 37: Middle East Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 38: Middle East Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 39: Middle East Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 40: Middle East Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 41: Middle East Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 42: Middle East Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 43: Middle East Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 44: Middle East Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 45: Middle East Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 46: Middle East Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 47: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 48: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 49: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 50: Middle East Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 51: Middle East Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 52: Middle East Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 53: Middle East Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 54: Middle East Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 55: Middle East Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 56: Middle East Data Center Construction Market Revenue Million Forecast, by United Arab Emirates 2019 & 2032
- Table 57: Middle East Data Center Construction Market Revenue Million Forecast, by Saudi Arabia 2019 & 2032
- Table 58: Middle East Data Center Construction Market Revenue Million Forecast, by Israel 2019 & 2032
- Table 59: Middle East Data Center Construction Market Revenue Million Forecast, by Qatar 2019 & 2032
- Table 60: Middle East Data Center Construction Market Revenue Million Forecast, by Oman 2019 & 2032
- Table 61: Middle East Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 62: Saudi Arabia Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 63: United Arab Emirates Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 64: Israel Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 65: Qatar Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 66: Kuwait Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 67: Oman Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 68: Bahrain Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 69: Jordan Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 70: Lebanon Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Middle East Data Center Construction Market?
The projected CAGR is approximately 14.74%.
2. Which companies are prominent players in the Middle East Data Center Construction Market?
Key companies in the market include Canovate S A, ABB Ltd, Johnson Controls International PLC, Fortis Construction, STULZ GMBH, Delta Group, Schneider Electric SE, Turner Construction Co, DPR Construction Inc, Caterpillar Inc, Airedale International Air Conditioning Ltd, Cummins Inc, AECOM Limited, Legrand, CyrusOne Inc, Future Digital data Systems, Ashi & Bushnag Co Ltd, EAE Group, Alfa Laval AB, Saan Zahav Ltd.
3. What are the main segments of the Middle East Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users, United Arab Emirates, Saudi Arabia, Israel, Qatar, Oman.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Rising Adoption of Renewable Energy Sources; Increase in 5G Deployments Fueling Edge Data Center Investments; Smart City Initiatives Driving Data Center Investments.
6. What are the notable trends driving market growth?
End-User Outlook.
7. Are there any restraints impacting market growth?
Security Challenges in Data Centers; Location Constraints on the Development of Data Centers.
8. Can you provide examples of recent developments in the market?
October 2022: Mohamed bin Ali bin Mohamed Al-Mannai, Minister of Communications and Information Technology, launched the M-VAULT 4's fourth data center building. Customers in Qatar can access cloud services through the Microsoft Cloud data center region housed in the new data center facility.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 5250, and USD 8750 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Middle East Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Middle East Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Middle East Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Middle East Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence