Key Insights
The North America data center construction market is experiencing robust growth, driven by the increasing demand for cloud computing, big data analytics, and the proliferation of IoT devices. The market's Compound Annual Growth Rate (CAGR) of 6.20% from 2019 to 2024 suggests a consistently expanding market, projected to continue its upward trajectory through 2033. Key drivers include the rising adoption of hyperscale data centers by major technology companies, the growing need for edge computing to minimize latency, and government initiatives promoting digital infrastructure development. Furthermore, the increasing focus on sustainable data center designs, incorporating energy-efficient cooling and power infrastructure, is shaping market trends. While the market faces some restraints, such as high construction costs and the complexities of navigating permitting and regulatory processes, these are largely offset by the substantial long-term benefits and returns associated with data center investments. The segmentation of the market reveals a strong demand across various end-user sectors, including IT & Telecommunications, BFSI (Banking, Financial Services, and Insurance), Government, and Healthcare, with significant investments observed in Tier 1 and Tier 3 data centers of varying sizes, from small to massive. Leading construction companies like Turner Construction Co and DPR Construction, alongside technology giants such as IBM and Schneider Electric, are actively shaping the landscape through their construction and technology solutions.
The North American region dominates the market, with the United States, Canada, and Mexico representing key contributors. The market's expansion is further fueled by advancements in infrastructure technologies, such as advanced cooling systems and high-efficiency power distribution units (PDUs). This ongoing innovation continues to drive efficiency gains and reduces operational costs for data center operators, creating further incentives for expansion and investment in new facilities. The forecast period (2025-2033) anticipates continued strong growth, indicating a sustained demand for specialized construction expertise and related services, making it an attractive market for both established players and new entrants focused on sustainable and innovative solutions. The market's success hinges on the ability of stakeholders to adapt to technological advancements, regulatory changes, and the evolving demands of the digital economy.

North America Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the North America data center construction market, encompassing market dynamics, growth trends, regional dominance, product landscape, key players, and future outlook. The study period covers 2019-2033, with a base year of 2025 and a forecast period of 2025-2033. This report is crucial for investors, industry professionals, and strategists seeking to understand and capitalize on opportunities within this rapidly expanding sector. The market is segmented by Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, Other Infrastructure; End-User (IT & Telecommunication, BFSI, Government, Healthcare, Other End User); Tier Type (Tier 1, Tier 2, Tier 3, Tier 4); Data Center Size (Small, Medium, Large, Mega, Massive); and Infrastructure (Cooling, Power). Key players analyzed include Turner Construction Co, Hensel Phelps Construction Co Inc, DPR CONSTRUCTION INC, Clune Construction Company LP, IBM Corporation, Holder Construction Company, Fortis Construction Inc, Nabholz Construction Corporation, Rittal GMBH & Co KG, Hitachi Corporation, AECOM, HITT Contracting Inc, and Schneider Electric SE.
North America Data Center Construction Market Dynamics & Structure
The North America data center construction market is characterized by moderate concentration, with a few large players holding significant market share, while numerous smaller firms cater to niche segments. Technological innovation, particularly in areas like AI-powered cooling and sustainable energy solutions, is a primary growth driver. Stringent regulatory frameworks surrounding data security and environmental compliance influence construction practices. The market also faces competition from alternative solutions, such as cloud computing and edge data centers, although these often necessitate further data center construction. M&A activity is relatively high, reflecting consolidation and expansion efforts within the industry. The IT & Telecommunication sector accounts for a significant proportion of the end-user market.
- Market Concentration: Moderately concentrated, with the top 5 players holding approximately xx% of market share in 2025.
- Technological Innovation: Focus on AI-driven cooling, renewable energy integration, and modular data center designs.
- Regulatory Frameworks: Stringent data security and environmental regulations driving construction standards.
- Competitive Substitutes: Cloud computing and edge data centers present competitive pressure.
- M&A Activity: Significant M&A activity observed in the period 2019-2024, with an estimated xx deals annually.
- End-User Demographics: IT & Telecommunication remains the dominant end-user sector.
North America Data Center Construction Market Growth Trends & Insights
The North America data center construction market experienced robust growth during the historical period (2019-2024), driven by increasing data generation, digital transformation initiatives across industries, and the expanding adoption of cloud computing. The market size reached an estimated value of $XX million in 2024, and is projected to register a CAGR of xx% during the forecast period (2025-2033), reaching $XX million by 2033. This growth is fueled by technological disruptions, such as the increasing adoption of 5G and IoT, and a shift towards larger-scale, hyperscale data centers. Consumer behavior, influenced by the rise of streaming services, online gaming, and remote work, further contributes to the demand for expanded data center capacity. Market penetration for advanced cooling solutions is expected to increase from xx% in 2024 to xx% in 2033.

Dominant Regions, Countries, or Segments in North America Data Center Construction Market
The dominant regions in the North America data center construction market include California, Texas, Virginia, and New Jersey. These regions benefit from established infrastructure, favorable regulatory environments, and proximity to large technology hubs. Within segments, the IT & Telecommunication sector leads end-user demand, followed by BFSI and Government. Among infrastructure types, Power Infrastructure and Cooling Infrastructure dominate due to their critical role in maintaining data center operations. Large and Mega data centers represent the highest growth segment by size.
- Key Drivers: Favorable government policies, robust digital infrastructure investments, and growing demand from hyperscale providers.
- Dominant Regions: California, Texas, Virginia, and New Jersey lead in market share and growth potential.
- Leading Segments: IT & Telecommunication (end-user), Large & Mega data centers (size), Power & Cooling Infrastructure.
North America Data Center Construction Market Product Landscape
Product innovation is centered on energy-efficient designs, prefabricated modular components, and improved cooling technologies. Applications range from hyperscale data centers to smaller colocation facilities. Key performance metrics focus on energy consumption, space utilization, and operational efficiency. Unique selling propositions include improved sustainability features, reduced construction time, and enhanced scalability. Advances in AI-powered predictive maintenance and remote monitoring contribute significantly to optimized operational efficiency.
Key Drivers, Barriers & Challenges in North America Data Center Construction Market
Key Drivers: Growing demand for data storage and processing, government initiatives promoting digital infrastructure development, and technological advancements in data center design and operations. For example, government incentives for renewable energy adoption are boosting investment in sustainable data center infrastructure.
Key Challenges: Supply chain disruptions related to specialized equipment, skilled labor shortages, and increasing construction costs. Regulatory hurdles, particularly concerning environmental permits, can also delay projects. Competitive pressures from established players and new entrants further challenge market participants. Supply chain issues lead to estimated project delays of xx% and increased costs of xx%.
Emerging Opportunities in North America Data Center Construction Market
Emerging opportunities include the growth of edge computing infrastructure, requiring widespread deployment of smaller, geographically distributed data centers. The increasing focus on sustainability presents opportunities for companies offering eco-friendly construction materials and energy-efficient solutions. Furthermore, the need for robust cybersecurity measures creates demand for specialized security infrastructure within data centers.
Growth Accelerators in the North America Data Center Construction Market Industry
Technological breakthroughs in energy-efficient cooling systems and renewable energy integration are key growth accelerators. Strategic partnerships between construction firms and technology providers facilitate innovation and market expansion. Government policies promoting digital infrastructure development create a favorable environment for data center construction.
Key Players Shaping the North America Data Center Construction Market Market
- Turner Construction Co
- Hensel Phelps Construction Co Inc
- DPR CONSTRUCTION INC
- Clune Construction Company LP
- IBM Corporation
- Holder Construction Company
- Fortis Construction Inc
- Nabholz Construction Corporation
- Rittal GMBH & Co KG
- Hitachi Corporation
- AECOM
- HITT Contracting Inc
- Schneider Electric SE
Notable Milestones in North America Data Center Construction Market Sector
- 2021: Introduction of a new modular data center design by DPR Construction significantly reducing construction time.
- 2022: Turner Construction Co partnered with a renewable energy provider to build a carbon-neutral data center.
- 2023: Acquisition of a smaller data center construction firm by Hensel Phelps Construction.
In-Depth North America Data Center Construction Market Outlook
The North America data center construction market is poised for continued growth, driven by the ongoing digital transformation and expanding data volumes. Strategic opportunities exist for companies offering sustainable, efficient, and scalable data center solutions. Focus on technological innovation, strategic partnerships, and expansion into emerging markets will be crucial for success. The increasing adoption of edge computing and the demand for higher levels of security will further shape the market in the coming years.
North America Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Others
-
1.1.2. Power Back up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Others
-
2.2. Power Back up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Others
-
4. Power Back up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier-I and II
- 11.2. Tier-III
- 11.3. Tier-IV
- 12. Tier-I and II
- 13. Tier-III
- 14. Tier-IV
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
-
21. Geography
- 21.1. United States
- 21.2. Canada
- 21.3. Mexico
- 22. United States
- 23. Canada
- 24. Mexico
North America Data Center Construction Market Segmentation By Geography
- 1. United States
- 2. Canada
- 3. Mexico

North America Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 6.20% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1 Growing Cloud Applications
- 3.2.2 AI
- 3.2.3 and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center
- 3.3. Market Restrains
- 3.3.1 High CaPex
- 3.3.2 OpEx & TCO for building Data Center
- 3.4. Market Trends
- 3.4.1. United States of America to hold major market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Others
- 5.1.1.2. Power Back up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Others
- 5.2.2. Power Back up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Others
- 5.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier-I and II
- 5.11.2. Tier-III
- 5.11.3. Tier-IV
- 5.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 5.13. Market Analysis, Insights and Forecast - by Tier-III
- 5.14. Market Analysis, Insights and Forecast - by Tier-IV
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Geography
- 5.21.1. United States
- 5.21.2. Canada
- 5.21.3. Mexico
- 5.22. Market Analysis, Insights and Forecast - by United States
- 5.23. Market Analysis, Insights and Forecast - by Canada
- 5.24. Market Analysis, Insights and Forecast - by Mexico
- 5.25. Market Analysis, Insights and Forecast - by Region
- 5.25.1. United States
- 5.25.2. Canada
- 5.25.3. Mexico
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.1.1.1. Power Distribution Solution
- 6.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.1.1.1.2. Transfer Switches
- 6.1.1.1.2.1. Static
- 6.1.1.1.2.2. Automatic (ATS)
- 6.1.1.1.3. Switchgear
- 6.1.1.1.3.1. Low-Voltage
- 6.1.1.1.3.2. Medium-Voltage
- 6.1.1.1.4. Power Panels and Components
- 6.1.1.1.5. Others
- 6.1.1.2. Power Back up Solutions
- 6.1.1.2.1. UPS
- 6.1.1.2.2. Generators
- 6.1.1.3. Service
- 6.1.1.1. Power Distribution Solution
- 6.1.2. Market Segmentation - By Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.2.1.1. Immersion Cooling
- 6.1.2.1.2. Direct-To-Chip Cooling
- 6.1.2.1.3. Rear Door Heat Exchanger
- 6.1.2.1.4. In-Row and In-Rack Cooling
- 6.1.2.2. Racks
- 6.1.2.3. Other Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.3. General Construction
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 6.2.1. Power Distribution Solution
- 6.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.2.1.2. Transfer Switches
- 6.2.1.2.1. Static
- 6.2.1.2.2. Automatic (ATS)
- 6.2.1.3. Switchgear
- 6.2.1.3.1. Low-Voltage
- 6.2.1.3.2. Medium-Voltage
- 6.2.1.4. Power Panels and Components
- 6.2.1.5. Others
- 6.2.2. Power Back up Solutions
- 6.2.2.1. UPS
- 6.2.2.2. Generators
- 6.2.3. Service
- 6.2.1. Power Distribution Solution
- 6.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 6.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.3.2. Transfer Switches
- 6.3.2.1. Static
- 6.3.2.2. Automatic (ATS)
- 6.3.3. Switchgear
- 6.3.3.1. Low-Voltage
- 6.3.3.2. Medium-Voltage
- 6.3.4. Power Panels and Components
- 6.3.5. Others
- 6.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 6.4.1. UPS
- 6.4.2. Generators
- 6.5. Market Analysis, Insights and Forecast - by Service
- 6.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.6.1.1. Immersion Cooling
- 6.6.1.2. Direct-To-Chip Cooling
- 6.6.1.3. Rear Door Heat Exchanger
- 6.6.1.4. In-Row and In-Rack Cooling
- 6.6.2. Racks
- 6.6.3. Other Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 6.7.1. Immersion Cooling
- 6.7.2. Direct-To-Chip Cooling
- 6.7.3. Rear Door Heat Exchanger
- 6.7.4. In-Row and In-Rack Cooling
- 6.8. Market Analysis, Insights and Forecast - by Racks
- 6.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 6.10. Market Analysis, Insights and Forecast - by General Construction
- 6.11. Market Analysis, Insights and Forecast - by Tier Type
- 6.11.1. Tier-I and II
- 6.11.2. Tier-III
- 6.11.3. Tier-IV
- 6.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 6.13. Market Analysis, Insights and Forecast - by Tier-III
- 6.14. Market Analysis, Insights and Forecast - by Tier-IV
- 6.15. Market Analysis, Insights and Forecast - by End User
- 6.15.1. Banking, Financial Services, and Insurance
- 6.15.2. IT and Telecommunications
- 6.15.3. Government and Defense
- 6.15.4. Healthcare
- 6.15.5. Other End Users
- 6.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 6.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 6.18. Market Analysis, Insights and Forecast - by Government and Defense
- 6.19. Market Analysis, Insights and Forecast - by Healthcare
- 6.20. Market Analysis, Insights and Forecast - by Other End Users
- 6.21. Market Analysis, Insights and Forecast - by Geography
- 6.21.1. United States
- 6.21.2. Canada
- 6.21.3. Mexico
- 6.22. Market Analysis, Insights and Forecast - by United States
- 6.23. Market Analysis, Insights and Forecast - by Canada
- 6.24. Market Analysis, Insights and Forecast - by Mexico
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.1.1.1. Power Distribution Solution
- 7.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.1.1.1.2. Transfer Switches
- 7.1.1.1.2.1. Static
- 7.1.1.1.2.2. Automatic (ATS)
- 7.1.1.1.3. Switchgear
- 7.1.1.1.3.1. Low-Voltage
- 7.1.1.1.3.2. Medium-Voltage
- 7.1.1.1.4. Power Panels and Components
- 7.1.1.1.5. Others
- 7.1.1.2. Power Back up Solutions
- 7.1.1.2.1. UPS
- 7.1.1.2.2. Generators
- 7.1.1.3. Service
- 7.1.1.1. Power Distribution Solution
- 7.1.2. Market Segmentation - By Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.2.1.1. Immersion Cooling
- 7.1.2.1.2. Direct-To-Chip Cooling
- 7.1.2.1.3. Rear Door Heat Exchanger
- 7.1.2.1.4. In-Row and In-Rack Cooling
- 7.1.2.2. Racks
- 7.1.2.3. Other Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.3. General Construction
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 7.2.1. Power Distribution Solution
- 7.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.2.1.2. Transfer Switches
- 7.2.1.2.1. Static
- 7.2.1.2.2. Automatic (ATS)
- 7.2.1.3. Switchgear
- 7.2.1.3.1. Low-Voltage
- 7.2.1.3.2. Medium-Voltage
- 7.2.1.4. Power Panels and Components
- 7.2.1.5. Others
- 7.2.2. Power Back up Solutions
- 7.2.2.1. UPS
- 7.2.2.2. Generators
- 7.2.3. Service
- 7.2.1. Power Distribution Solution
- 7.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 7.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.3.2. Transfer Switches
- 7.3.2.1. Static
- 7.3.2.2. Automatic (ATS)
- 7.3.3. Switchgear
- 7.3.3.1. Low-Voltage
- 7.3.3.2. Medium-Voltage
- 7.3.4. Power Panels and Components
- 7.3.5. Others
- 7.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 7.4.1. UPS
- 7.4.2. Generators
- 7.5. Market Analysis, Insights and Forecast - by Service
- 7.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.6.1.1. Immersion Cooling
- 7.6.1.2. Direct-To-Chip Cooling
- 7.6.1.3. Rear Door Heat Exchanger
- 7.6.1.4. In-Row and In-Rack Cooling
- 7.6.2. Racks
- 7.6.3. Other Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 7.7.1. Immersion Cooling
- 7.7.2. Direct-To-Chip Cooling
- 7.7.3. Rear Door Heat Exchanger
- 7.7.4. In-Row and In-Rack Cooling
- 7.8. Market Analysis, Insights and Forecast - by Racks
- 7.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 7.10. Market Analysis, Insights and Forecast - by General Construction
- 7.11. Market Analysis, Insights and Forecast - by Tier Type
- 7.11.1. Tier-I and II
- 7.11.2. Tier-III
- 7.11.3. Tier-IV
- 7.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 7.13. Market Analysis, Insights and Forecast - by Tier-III
- 7.14. Market Analysis, Insights and Forecast - by Tier-IV
- 7.15. Market Analysis, Insights and Forecast - by End User
- 7.15.1. Banking, Financial Services, and Insurance
- 7.15.2. IT and Telecommunications
- 7.15.3. Government and Defense
- 7.15.4. Healthcare
- 7.15.5. Other End Users
- 7.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 7.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 7.18. Market Analysis, Insights and Forecast - by Government and Defense
- 7.19. Market Analysis, Insights and Forecast - by Healthcare
- 7.20. Market Analysis, Insights and Forecast - by Other End Users
- 7.21. Market Analysis, Insights and Forecast - by Geography
- 7.21.1. United States
- 7.21.2. Canada
- 7.21.3. Mexico
- 7.22. Market Analysis, Insights and Forecast - by United States
- 7.23. Market Analysis, Insights and Forecast - by Canada
- 7.24. Market Analysis, Insights and Forecast - by Mexico
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.1.1.1. Power Distribution Solution
- 8.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.1.1.1.2. Transfer Switches
- 8.1.1.1.2.1. Static
- 8.1.1.1.2.2. Automatic (ATS)
- 8.1.1.1.3. Switchgear
- 8.1.1.1.3.1. Low-Voltage
- 8.1.1.1.3.2. Medium-Voltage
- 8.1.1.1.4. Power Panels and Components
- 8.1.1.1.5. Others
- 8.1.1.2. Power Back up Solutions
- 8.1.1.2.1. UPS
- 8.1.1.2.2. Generators
- 8.1.1.3. Service
- 8.1.1.1. Power Distribution Solution
- 8.1.2. Market Segmentation - By Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.2.1.1. Immersion Cooling
- 8.1.2.1.2. Direct-To-Chip Cooling
- 8.1.2.1.3. Rear Door Heat Exchanger
- 8.1.2.1.4. In-Row and In-Rack Cooling
- 8.1.2.2. Racks
- 8.1.2.3. Other Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.3. General Construction
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 8.2.1. Power Distribution Solution
- 8.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.2.1.2. Transfer Switches
- 8.2.1.2.1. Static
- 8.2.1.2.2. Automatic (ATS)
- 8.2.1.3. Switchgear
- 8.2.1.3.1. Low-Voltage
- 8.2.1.3.2. Medium-Voltage
- 8.2.1.4. Power Panels and Components
- 8.2.1.5. Others
- 8.2.2. Power Back up Solutions
- 8.2.2.1. UPS
- 8.2.2.2. Generators
- 8.2.3. Service
- 8.2.1. Power Distribution Solution
- 8.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 8.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.3.2. Transfer Switches
- 8.3.2.1. Static
- 8.3.2.2. Automatic (ATS)
- 8.3.3. Switchgear
- 8.3.3.1. Low-Voltage
- 8.3.3.2. Medium-Voltage
- 8.3.4. Power Panels and Components
- 8.3.5. Others
- 8.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 8.4.1. UPS
- 8.4.2. Generators
- 8.5. Market Analysis, Insights and Forecast - by Service
- 8.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.6.1.1. Immersion Cooling
- 8.6.1.2. Direct-To-Chip Cooling
- 8.6.1.3. Rear Door Heat Exchanger
- 8.6.1.4. In-Row and In-Rack Cooling
- 8.6.2. Racks
- 8.6.3. Other Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 8.7.1. Immersion Cooling
- 8.7.2. Direct-To-Chip Cooling
- 8.7.3. Rear Door Heat Exchanger
- 8.7.4. In-Row and In-Rack Cooling
- 8.8. Market Analysis, Insights and Forecast - by Racks
- 8.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 8.10. Market Analysis, Insights and Forecast - by General Construction
- 8.11. Market Analysis, Insights and Forecast - by Tier Type
- 8.11.1. Tier-I and II
- 8.11.2. Tier-III
- 8.11.3. Tier-IV
- 8.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 8.13. Market Analysis, Insights and Forecast - by Tier-III
- 8.14. Market Analysis, Insights and Forecast - by Tier-IV
- 8.15. Market Analysis, Insights and Forecast - by End User
- 8.15.1. Banking, Financial Services, and Insurance
- 8.15.2. IT and Telecommunications
- 8.15.3. Government and Defense
- 8.15.4. Healthcare
- 8.15.5. Other End Users
- 8.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 8.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 8.18. Market Analysis, Insights and Forecast - by Government and Defense
- 8.19. Market Analysis, Insights and Forecast - by Healthcare
- 8.20. Market Analysis, Insights and Forecast - by Other End Users
- 8.21. Market Analysis, Insights and Forecast - by Geography
- 8.21.1. United States
- 8.21.2. Canada
- 8.21.3. Mexico
- 8.22. Market Analysis, Insights and Forecast - by United States
- 8.23. Market Analysis, Insights and Forecast - by Canada
- 8.24. Market Analysis, Insights and Forecast - by Mexico
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 9. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Rest of North America North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13. Competitive Analysis
- 13.1. Market Share Analysis 2024
- 13.2. Company Profiles
- 13.2.1 Turner Construction Co
- 13.2.1.1. Overview
- 13.2.1.2. Products
- 13.2.1.3. SWOT Analysis
- 13.2.1.4. Recent Developments
- 13.2.1.5. Financials (Based on Availability)
- 13.2.2 Hensel Phelps Construction Co Inc
- 13.2.2.1. Overview
- 13.2.2.2. Products
- 13.2.2.3. SWOT Analysis
- 13.2.2.4. Recent Developments
- 13.2.2.5. Financials (Based on Availability)
- 13.2.3 DPR CONSTRUCTION INC
- 13.2.3.1. Overview
- 13.2.3.2. Products
- 13.2.3.3. SWOT Analysis
- 13.2.3.4. Recent Developments
- 13.2.3.5. Financials (Based on Availability)
- 13.2.4 Clune Construction Company LP
- 13.2.4.1. Overview
- 13.2.4.2. Products
- 13.2.4.3. SWOT Analysis
- 13.2.4.4. Recent Developments
- 13.2.4.5. Financials (Based on Availability)
- 13.2.5 IBM Corporation
- 13.2.5.1. Overview
- 13.2.5.2. Products
- 13.2.5.3. SWOT Analysis
- 13.2.5.4. Recent Developments
- 13.2.5.5. Financials (Based on Availability)
- 13.2.6 Holder Construction Company
- 13.2.6.1. Overview
- 13.2.6.2. Products
- 13.2.6.3. SWOT Analysis
- 13.2.6.4. Recent Developments
- 13.2.6.5. Financials (Based on Availability)
- 13.2.7 Fortis Construction Inc
- 13.2.7.1. Overview
- 13.2.7.2. Products
- 13.2.7.3. SWOT Analysis
- 13.2.7.4. Recent Developments
- 13.2.7.5. Financials (Based on Availability)
- 13.2.8 Nabholz Construction Corporation
- 13.2.8.1. Overview
- 13.2.8.2. Products
- 13.2.8.3. SWOT Analysis
- 13.2.8.4. Recent Developments
- 13.2.8.5. Financials (Based on Availability)
- 13.2.9 Rittal GMBH & Co KG
- 13.2.9.1. Overview
- 13.2.9.2. Products
- 13.2.9.3. SWOT Analysis
- 13.2.9.4. Recent Developments
- 13.2.9.5. Financials (Based on Availability)
- 13.2.10 Hitachi Corporation
- 13.2.10.1. Overview
- 13.2.10.2. Products
- 13.2.10.3. SWOT Analysis
- 13.2.10.4. Recent Developments
- 13.2.10.5. Financials (Based on Availability)
- 13.2.11 AECOM
- 13.2.11.1. Overview
- 13.2.11.2. Products
- 13.2.11.3. SWOT Analysis
- 13.2.11.4. Recent Developments
- 13.2.11.5. Financials (Based on Availability)
- 13.2.12 HITT Contrating Inc
- 13.2.12.1. Overview
- 13.2.12.2. Products
- 13.2.12.3. SWOT Analysis
- 13.2.12.4. Recent Developments
- 13.2.12.5. Financials (Based on Availability)
- 13.2.13 Schneider Electric SE
- 13.2.13.1. Overview
- 13.2.13.2. Products
- 13.2.13.3. SWOT Analysis
- 13.2.13.4. Recent Developments
- 13.2.13.5. Financials (Based on Availability)
- 13.2.1 Turner Construction Co
List of Figures
- Figure 1: North America Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: North America Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 10: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 11: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 18: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 19: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 20: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 21: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 22: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 23: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 24: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 25: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 26: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 27: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 28: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 29: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 30: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 31: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 34: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 35: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 36: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 37: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 38: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 39: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 40: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 41: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 42: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 43: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 44: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 45: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 46: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 47: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 48: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 49: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 50: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 51: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 52: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 53: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 54: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 55: United States North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 56: United States North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 57: Canada North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 58: Canada North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 59: Mexico North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 60: Mexico North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 61: Rest of North America North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 62: Rest of North America North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 63: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 64: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 65: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 66: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 67: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 68: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 69: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 70: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 71: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 72: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 73: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 74: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 75: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 76: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 77: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 78: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 79: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 80: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 81: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 82: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 83: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 84: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 85: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 86: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 87: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 88: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 89: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 90: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 91: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 92: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 93: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 94: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 95: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 96: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 97: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 98: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 99: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 100: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 101: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 102: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 103: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 104: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 105: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 106: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 107: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 108: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 109: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 110: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 111: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 112: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 113: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 114: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 115: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 116: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 117: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 118: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 119: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 120: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 121: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 122: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 123: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 124: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 125: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 126: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 127: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 128: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 129: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 130: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 131: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 132: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 133: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 134: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 135: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 136: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 137: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 138: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 139: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 140: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 141: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 142: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 143: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 144: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 145: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 146: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 147: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 148: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 149: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 150: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 151: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 152: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 153: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 154: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 155: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 156: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 157: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 158: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 159: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 160: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 161: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 162: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 163: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 164: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 165: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 166: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 167: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 168: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 169: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 170: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 171: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 172: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 173: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 174: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 175: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 176: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 177: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 178: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 179: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 180: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 181: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 182: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 183: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 184: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 185: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 186: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 187: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 188: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 189: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 190: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 191: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 192: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 193: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 194: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 195: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 196: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 197: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 198: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 199: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 200: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 201: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 202: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 203: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 204: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 205: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 206: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 207: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 208: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 209: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 210: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 211: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 212: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the North America Data Center Construction Market?
The projected CAGR is approximately 6.20%.
2. Which companies are prominent players in the North America Data Center Construction Market?
Key companies in the market include Turner Construction Co, Hensel Phelps Construction Co Inc, DPR CONSTRUCTION INC, Clune Construction Company LP, IBM Corporation, Holder Construction Company, Fortis Construction Inc, Nabholz Construction Corporation, Rittal GMBH & Co KG, Hitachi Corporation, AECOM, HITT Contrating Inc, Schneider Electric SE.
3. What are the main segments of the North America Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back up Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier-I and II, Tier-III, Tier-IV, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users, Geography, United States, Canada, Mexico.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Growing Cloud Applications. AI. and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center.
6. What are the notable trends driving market growth?
United States of America to hold major market share.
7. Are there any restraints impacting market growth?
High CaPex. OpEx & TCO for building Data Center.
8. Can you provide examples of recent developments in the market?
N/A
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 5250, and USD 8750 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "North America Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the North America Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the North America Data Center Construction Market?
To stay informed about further developments, trends, and reports in the North America Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence